Travel Information Europe
Travel InformationEUROPE · 21 COUNTRIES
🇫🇷 FR E10 €2.146 +0.038 🇩🇪 DE E10 €2.388 −0.013 🇮🇹 IT Diesel €2.188 +0.039 🇪🇸 Spain: new road rules from 1 October 🇦🇹 AT E10 €1.896 +0.048 🇪🇸 ES E10 €1.816 +0.072 🇫🇷 EV road trip France: 195k+ chargers 🇵🇱 PL E10 €1.812 +0.231 🇳🇱 NL E10 €2.466 +0.092 🇬🇷 GR Diesel €2.054 +0.026 🇧🇪 Belgium 2027 toll vignette 🇨🇭 CH Vignette CHF 40 🇦🇹 AT 10-Tage €11.50 🇫🇷 FR E10 €2.146 +0.038 🇩🇪 DE E10 €2.388 −0.013 🇮🇹 IT Diesel €2.188 +0.039 🇪🇸 Spain: new road rules from 1 October 🇦🇹 AT E10 €1.896 +0.048 🇪🇸 ES E10 €1.816 +0.072 🇫🇷 EV road trip France: 195k+ chargers 🇵🇱 PL E10 €1.812 +0.231 🇳🇱 NL E10 €2.466 +0.092 🇬🇷 GR Diesel €2.054 +0.026 🇧🇪 Belgium 2027 toll vignette 🇨🇭 CH Vignette CHF 40 🇦🇹 AT 10-Tage €11.50
🇳🇱 Netherlands travel guide

Netherlands EV Charging 2026: Densest Network in Europe

Complete EV-charging guide for the Netherlands: 200,000+ public points, kerbside Fastned/Allego/Vattenfall density, EnBW + ANWB Energie roaming, costs.

⚡ Short answer

The Netherlands has over 200,000 public charge points (RVO 2026), the densest network in Europe. Top networks: Vattenfall InCharge, Allego, Shell Recharge, Fastned. AFIR contactless card payment mandatory. Cost: EUR 0.49-0.79/kWh. Best apps: ANWB Energie, Shell Recharge, Plugsurfing.

EV charging map

8,174 stations
Loading map…

Networks

  • EVBox2,055
  • EVnetNL1,788
  • Shell Recharge Solutions (BE)1,177
  • Allego BV691
  • Alfen486
  • Essent (NL)260
  • Ecotap230
  • PowerGo131

Data: OpenChargeMap (Open Database License (ODbL)). Updated 11 September 2026. openchargemap.org

On this page

The Dutch EV market in 2026

The Netherlands is one of the most EV-mature markets in Europe. Battery-electric cars now make up about 32% of new sales (2025 figure), driven by company-car tax breaks (bijtelling 16% for BEVs vs 22% for ICE), no on-street parking permit limits and the densest public network on the continent.

About 490,000 BEVs and 270,000 PHEVs are on the road. The government’s Nationale Agenda Laadinfrastructuur (NAL) targets 1.7 million public charge points by 2030. Right now there are about 200,000 publicly accessible points, broken down as:

  • 195,000 AC chargers (Type 2, 3-22 kW), most on-street kerbside
  • 3,400 DC fast chargers (50-150 kW)
  • 1,000 ultra-rapid HPC (150-350 kW)
  • 12 hydrogen filling stations (separate network)

The unique on-street kerbside network

What makes the Netherlands different is the on-street kerbside AC infrastructure. Walk down almost any residential street in Amsterdam, Rotterdam, Utrecht, The Hague, Eindhoven, Groningen or Maastricht and you find a slim Type 2 charger every 50-100 metres. The system was driven by municipal “right to charge” policies introduced from 2017 onward.

For a visitor, this means you can arrive in any Dutch city without a charging hotel, park on the street and charge overnight at AC 3.7-11 kW for EUR 0.39-0.49/kWh. The Vattenfall, Allego and EVnetNL on-street points all accept the same major roaming RFID cards.

How kerbside works

  • Plug in your own Type 2 cable (not supplied at the post)
  • Tap your RFID card on the reader, or scan the QR code with your app
  • Authentication starts the session, typically within 5 seconds
  • Charge proceeds at 3.7, 7.4 or 11 kW depending on the post and your car
  • Tap card again to stop, unplug, drive on

Parking enforcement is integrated: in most cities, the EV bay is reserved for an actively charging EV. Park empty or with a non-charging ICE → fine of EUR 95 + tow.

Major networks

NetworkSitesConnector mixTypical tariff
Vattenfall InCharge65,000+AC kerbside + some DCEUR 0.45 AC, EUR 0.59 DC
Allego60,000+AC + DC + HPCEUR 0.49 AC, EUR 0.69 HPC
EVnetNL (Eneco)33,000+AC kerbsideEUR 0.45 AC
Shell Recharge / NewMotion22,000+AC + DC + HPCEUR 0.49 AC, EUR 0.69 HPC
Fastned250+Ultra-rapid CCS onlyEUR 0.69 (free tier), EUR 0.49 (Gold)
Tesla Supercharger75+CCS (open to non-Tesla)EUR 0.59 (non-Tesla)
Ionity30+Ultra-rapid CCSEUR 0.69 (no sub)
Greenflux15,000+AC + DC roamingEUR 0.49 (varies by site)

Vattenfall + Allego + EVnetNL together cover virtually every Dutch street. Fastned dominates the autostrade hubs.

Payment methods

Four routes, all valid:

  1. Contactless credit/debit card at the terminal. Mandatory by EU AFIR since April 2024 on every new charger above 50 kW. Visa, Mastercard, AMEX, Apple Pay, Google Pay all work.
  2. Operator app: Vattenfall InCharge, Shell Recharge, Fastned, Allego apps. Live availability + payment + history.
  3. Roaming RFID card: EnBW mobility+, ANWB Energie, Plugsurfing, Chargemap Pass, Octopus Electroverse. One card across operators at the issuer’s pricing.
  4. Ad-hoc QR code: scan, pay via webform. About EUR 0.05-0.10/kWh more than app pricing.

For a 1-2 week visit, the simplest combo is your home roaming card (e.g. EnBW mobility+ for German visitors, Octopus Electroverse for UK visitors) plus contactless credit card as backup.

Cost: EV vs ICE in the Netherlands

Comparison for a typical 500 km trip in a Hyundai IONIQ 5 (78 kWh battery, real-world 18 kWh/100km) vs a comparable petrol crossover (real-world 7.5 l/100km E10 at EUR 2.07/litre):

Charging strategyEnergy neededCostPer km
Home overnight (off-peak EUR 0.20)90 kWhEUR 18.00EUR 0.036
AC kerbside (EUR 0.45)90 kWhEUR 40.50EUR 0.081
DC fast 80% of charge (EUR 0.60)72 kWhEUR 43.20EUR 0.086
HPC Fastned (EUR 0.69)90 kWhEUR 62.10EUR 0.124
Petrol E10 (EUR 2.07/l)37.5 lEUR 77.63EUR 0.155

So even using ultra-rapid charging exclusively, the BEV is 20-25% cheaper per km than a comparable petrol car. With home or AC kerbside the gap is 2-4x in favour of the EV.

Roaming apps explained

EnBW mobility+

The most flexible card for German and Dutch visitors. EUR 5.99/month gets you AC EUR 0.45 + DC EUR 0.49 + HPC EUR 0.59 across the whole EU including 95% of Dutch operators. Works at Vattenfall, Allego, Shell Recharge, EVnetNL, Fastned, Tesla and Ionity. RFID card or in-app authentication.

ANWB Energie / ANWB Mobility card

Dutch consumer association ANWB issues a roaming card with broad EU coverage. EUR 5/month + per-kWh costs slightly above EnBW. Best for visitors who already hold ANWB membership.

Shell Recharge (formerly NewMotion)

Owned by Shell since 2017. Massive roaming network: 750,000+ charge points across Europe. Works at virtually every Dutch operator. Per-kWh tariff varies by underlying operator (you see the price before plugging in).

Octopus Electroverse

UK-based supplier’s roaming offering. Free to use, no fee. Their app shows the prices for each station in advance. Good for UK visitors.

Plugsurfing

Munich-based, owned by Fortum. EUR 0 setup, per-kWh varies by operator. Works at all major Dutch networks.

Fastned membership

For visitors planning many HPC stops, Fastned Gold (EUR 11.99/month) drops the per-kWh from EUR 0.69 to EUR 0.49 at all 250+ Fastned sites in NL. Pays off after about 200 kWh of HPC charging.

Amsterdam to Maastricht (220 km)

A2 corridor, ~3 hours direct. Charging stops:

  • A2 Goes-Maartensdijk: optional 15-min top-up at Fastned (EUR 12-18 for 100 km)
  • A2 Boxtel-Vught: 20-min Fastned 175 kW (EUR 18-25 for 150 km)
  • Maastricht arrival: free or cheap kerbside AC overnight

Typical total cost: EUR 30-45 for the round trip.

Rotterdam to German border (Venlo) (170 km)

A15 + A73, ~2 hours. One HPC stop at A15 Tiel (Fastned 250 kW) is sufficient for any modern EV. Cost: EUR 25-35.

Amsterdam to Hoek van Holland for the UK ferry (90 km)

A4 + A20. No charging stop needed in most EVs. Stena Line ferry terminal has Vattenfall AC kerbside chargers for pre-boarding top-up.

Special cases: hotels, parks, P+R

  • Hotels: Mercure, Hilton, Marriott, Park Plaza chains universally have AC chargers for guests. Premier Inn and IBIS budget brands often charge EUR 0.45-0.55/kWh. Filter via Booking.com “EV charger”.
  • Holiday parks: Center Parcs, Roompot, Landal, EuroParcs all have AC chargers, usually free or low-cost for park-card holders.
  • P+R: Park-and-Ride lots in Amsterdam (P+R Olympisch Stadion, P+R RAI), Rotterdam (P+R Slinge, P+R Kralingse Zoom), The Hague, Utrecht, Eindhoven include reserved EV bays with AC. Usually EUR 1-3/day or free with public-transport ticket.
  • Workplaces: many Dutch employer fleets cover guest charging. Ask at reception.

Winter charging in the Netherlands

Dutch winters are mild (rare below -5°C in the lowlands). DC speeds are usually 90-100% of summer rated even in January. Exception: the Veluwe region and the southeast (Limburg) can see -10°C nights. In those cases:

  • Pre-condition the battery via the navigation route planner before arrival
  • Allow 5-10 minutes longer at the HPC for the same SoC gain
  • Park EVs over Christmas at a Type 2 destination charger so the battery stays warm overnight

Charging speeds by car

Approximate peak DC fast charging speeds at a 350 kW HPC station for typical 2024-2026 models:

CarPeak kW10-80% time
Porsche Taycan27018 min
Hyundai IONIQ 5/6, Kia EV623518 min
Mercedes EQS20022 min
BMW iX19522 min
Tesla Model 3 LR25020 min
Tesla Model Y17028 min
VW ID.4/ID.5, Audi Q4 e-tron17028 min
Renault Megane E-Tech13032 min
Mini Cooper SE7035 min

Many older EVs (2018-2019) are capped at 50 kW even at HPC sites. Check your car’s owner manual.

Practical tips for visiting EV drivers

  • Install EnBW mobility+ or ANWB Energie roaming before crossing the border.
  • Use A Better Route Planner (ABRP) or Google Maps EV routing for any trip over 200 km.
  • Bring your own Type 2 cable for kerbside charging.
  • Contactless credit card is your fallback at every newer station (mandatory by EU law since April 2024).
  • Park-and-charge: respect the rule that bays are for charging cars only; police actively enforce.
  • Tesla Superchargers are open to all CCS2 cars in NL since 2022.
  • Off-peak home electricity tariff (23:00-07:00) is EUR 0.18-0.25/kWh; if staying with friends, charge overnight.

EV charging in other European countries

Frequently asked questions

How many EV charge points are in the Netherlands?
Per the RVO Nationale Agenda Laadinfrastructuur dashboard there are 200,000+ publicly accessible charge points in 2026, of which about 3,400 are DC fast (50+ kW) and 1,000 are ultra-rapid (150+ kW). With ~520,000 charge points per 1 million inhabitants (public + private), the Netherlands has the highest density of any EU country. Amsterdam alone has more on-street kerbside chargers than all of Belgium combined.
Which charging app should I use as a foreign EV driver?
For broadest coverage: EnBW mobility+ (350,000+ EU points, one tariff including 95% of NL), Plugsurfing, Chargemap Pass or Shell Recharge (works at every Shell-affiliated NewMotion/Allego site). UK visitors get the best value from Octopus Electroverse. German visitors keep their EnBW mobility+ card. Tesla in-car nav routes Tesla owners through Tesla Superchargers; non-Tesla drivers can also use Tesla SC via the Tesla app since 2022.
How much does it cost to charge an EV in the Netherlands?
Wide range depending on connector and operator: EUR 0.39-0.49/kWh at on-street AC kerbside (Vattenfall, Allego); EUR 0.55-0.65/kWh at DC fast (50-150 kW); EUR 0.65-0.79/kWh at ultra-rapid (150-350 kW) Fastned or Ionity. Subscription tariffs reduce cost by 20-30%: EnBW M (EUR 5.99/month), Fastned Gold (EUR 11.99/month), Ionity Passport (EUR 17.99/month). Home charging at off-peak is famously cheap at EUR 0.18-0.25/kWh.
How do I charge at a Dutch on-street kerbside point as a visitor?
Almost every Dutch street in town has a Type 2 AC charger (3-22 kW) operated by Vattenfall, EVnetNL, Allego or the local municipality. To use it: tap a roaming RFID card (EnBW, Plugsurfing, Chargemap, NewMotion) on the reader, scan the QR code with the operator app, or use contactless credit card. The cable is car-supplied; bring your Type 2 cable. Parking is usually free for the duration of the charge in Amsterdam, Rotterdam, Utrecht and The Hague.
Are Dutch motorway service areas covered for DC fast charging?
Yes, fully. Every motorway service area on the A1, A2, A4, A12, A27, A28, A50 and A58 has at least 2 ultra-rapid chargers (150 kW+), usually Fastned, Allego or Shell Recharge sites. The A2 Den Bosch-Eindhoven corridor and the A12 Utrecht-German border have particularly dense coverage with Fastned hubs every 50-80 km. No mandatory station gap exceeds 25 km on the main motorway network.