Switzerland live traffic: TCS (tcs.ch) + Viasuisse official. Gotthard tunnel A2 worst bottleneck (queues 1-3h summer). N1 Zurich-Bern busiest commuter. TCS app + Touring Club. Alpine pass closures Nov-May - check before crossing.
Live road incidents
SwitzerlandCurrent traffic disruptions on Switzerland roads, refreshed every 15 minutes from official DATEX II feeds.
Currently 207 roadworks / jam on A2, A1, A3. Last updated 11 Nov 2026, 16:30.
Map of active incidents. Colours: red = severe, orange = moderate, green = minor.
| Road | Location | What | Length | Period | |
|---|---|---|---|---|---|
| A1 | Bern → Zürich | Congestionzwischen Autobahndreieck Verzweigung Luterbach und Anschluss Wangen an der Aare Sachlage: Stau Ursache: Verkehrsüberlastung Zusatz 1: Zeitverlust Anz. [min] 15 | - | 58 min ago | |
| A1 | St. Gallen → Zürich | Congestionzwischen Parkplatz Baltenswil und Autobahndreieck Verzweigung Zürich-Ost Sachlage: Stau Ursache: Verkehrsüberlastung | - | 2h ago | |
| A1 | Bern → Zürich | Congestionzwischen Autobahndreieck Verzweigung Wankdorf und Anschluss Kirchberg Sachlage: Stau Ursache: Unfall Verkehrsführung: Pannenstreifen blockiert | - | 28 min ago | |
| A1 | Bern → St. Gallen | Congestionzwischen Anschluss Dietikon und Tunnel Gubrist-Tunnel Sachlage: stockender Verkehr Ursache: Verkehrsüberlastung | - | 3h ago | |
| A1 | Zürich → Bern | Congestionzwischen Autobahndreieck Verzweigung Härkingen und Anschluss Oensingen Sachlage: stockender Verkehr Ursache: Verkehrsüberlastung | - | 51 min ago | |
| A1 | Zürich → St. Margrethen | Congestionzwischen Anschluss St. Gallen-Winkeln und Anschluss St. Gallen-Neudorf Sachlage: stockender Verkehr Ursache: Verkehrsüberlastung | - | 1h ago | |
| A1 | Bern → St. Gallen | Congestionzwischen Parkplatz Büsisee und Autobahndreieck Verzweigung Zürich-Ost Sachlage: stockender Verkehr Ursache: Verkehrsüberlastung | - | 1h ago | |
| A1 | Lausanne → Genf | Congestionzwischen Anschluss Flughafen Genf und Anschluss Bernex Sachlage: stockender Verkehr Ursache: Verkehrsüberlastung | - | 36 min ago | |
| A1 | Zürich → Bern | Congestionzwischen Autobahnkreuz Verzweigung Limmattal und Parkplatz Birrhard Sachlage: stockender Verkehr Ursache: Verkehrsüberlastung | - | 27 min ago | |
| A2 | Luzern → Basel | Congestionzwischen Anschluss Diegten und Anschluss Sissach, bei Kilometer 28.0 Sachlage: Stau Ursache: Verkehrsüberlastung | - | 2h ago | |
| A2 | Gotthard → Chiasso | Congestionzwischen Anschluss Lugano-Nord und Anschluss Melide/Bissone Sachlage: Stau Ursache: Verkehrsüberlastung | - | 37 min ago | |
| A2 | Gotthard → Chiasso | Congestionzwischen Anschluss Chiasso-Centro und Zollstation Chiasso-Brogeda Sachlage: Stau Ursache: Verkehrsüberlastung | - | 23 min ago | |
| A2 | Luzern → Basel | Congestionzwischen Tunnel Schweizerhalle-Tunnel und Anschluss Basel-Badischer Bahnhof Sachlage: stockender Verkehr Ursache: Verkehrsüberlastung | - | 40 min ago | |
| A2 | Basel → Luzern | Congestionzwischen Anschluss Basel-Wettstein und Tunnel Schweizerhalle-Tunnel Sachlage: stockender Verkehr Ursache: Verkehrsüberlastung | - | 39 min ago | |
| A3 | Verzweigung Rheinfelden → Deutschland | Congestionzwischen Autobahndreieck Verzweigung Rheinfelden und Zollstation Rheinfelden Sachlage: Stau Ursache: Verkehrsüberlastung | - | 31 min ago | |
| A3 | Chur → Basel | Congestionzwischen Anschluss Urdorf-Süd und Autobahnkreuz Verzweigung Limmattal Sachlage: stockender Verkehr Ursache: Verkehrsüberlastung | - | 3h ago | |
| A4 | Winterthur → Schaffhausen | Congestionzwischen Autobahndreieck Verzweigung Winterthur-Nord und Tunnel Kaiserbuck-Tunnel Sachlage: stockender Verkehr Ursache: Verkehrsüberlastung | - | 2h ago | |
| A5 | Biel → Neuenburg | Congestionzwischen Autobahndreieck Verzweigung Thielle und Anschluss St-Blaise Sachlage: Stau Ursache: Verkehrsüberlastung Zusatz 1: Zeitverlust Anz. [min] 20 | - | 39 min ago | |
| A14 | Zug → Luzern | Congestionzwischen Anschluss Gisikon-Root und Autobahndreieck Verzweigung Rotsee Sachlage: stockender Verkehr Ursache: Verkehrsüberlastung | - | 42 min ago | |
| A15 | Brüttisellen → Uster | Congestionzwischen Anschluss Uster-Nord und Anschluss Uster-Ost Sachlage: stockender Verkehr Ursache: Verkehrsüberlastung | - | 29 min ago |
Machine-readable feed: /data/incidents-ch.json (JSON, refreshed every 15 min)
On this page
- Switzerland’s motorway live picture
- Live overview map of Switzerland
- Worst congestion corridors
- The Gotthard bottleneck
- A1 Zurich-Geneva corridor
- A13 San Bernardino corridor
- Alpine pass status
- Tunnel closures and emergency procedures
- Saturday-by-Saturday summer planning
- Live tools to use during your trip
- Snow chains and winter equipment
About the incidents table above: Switzerland’s official DATEX II feed (FEDRO) reports at fine granularity, including short local roadworks and long-running motorway construction. This is why the total count is higher than in neighbouring countries whose national feeds pre-filter more aggressively. Use the Priority chip for the curated traveller view; All shows the raw feed; Road, Jams, Roadworks and Closed narrow it further.
Switzerland’s motorway live picture
The Swiss motorway network is short (about 1,900 km of national roads) but dense and highly used. The federal roads office ASTRA reports that about 30 percent of all motorway delay-hours happen on just 3 percent of the network, concentrated at the Gotthard tunnel, the Limmattal junction near Zurich and the Bareggtunnel between Baden and Zurich. Visitors transiting north-south through the country will normally only encounter the Gotthard issue; commuters around Zurich and Geneva see daily congestion at the local hotspots.
Main corridors:
- A2 Gotthard axis: Basel-Lucerne-Lugano-Chiasso (295 km). The strategic Alps crossing.
- A1 spine: Zurich-Bern-Lausanne-Geneva (280 km). The country’s longest motorway.
- A13 San Bernardino: Chur-Bellinzona (180 km). Free alternative to Gotthard.
- A3 Basel-Sissach-Zurich: northern east-west route (95 km).
- A4 Knonaueramt: Zurich south ring + Gotthard feed (25 km).
Live overview map of Switzerland
For live traffic across the country: ViaSuisse plus apps Google Maps or Waze. Click a corridor below for peak forecasts.
Worst congestion corridors
Based on aggregate ASTRA Verkehrsfluss-Monitoring + TCS Stauindex data. Click any corridor for a dedicated live map, peak-hour forecast, incident pattern and alternative routes.
| Corridor | Annual congestion km | Reason |
|---|---|---|
| A2 Gotthard (Basel-Chiasso) | 110,000 km | Single-bore tunnel + Saturday holiday traffic |
| A1 (Zurich-Bern-Geneva) | 85,000 km | Commercial spine, daily commute around ZH and GE |
| A13 San Bernardino (Chur-Bellinzona) | 45,000 km | Diverted Gotthard load + Grisons ski |
| A1 Zurich Limmattal + Baregg | 38,000 km | Switzerland's worst daily commuter section |
| A1 Lausanne-Geneva | 32,000 km | Geneva commute + Bardonnex customs |
| A2 Lugano-Chiasso | 28,000 km | Italian border customs at Brogeda |
| A2 Belchen tunnel (Basel-Bern) | 24,000 km | Friday afternoon recurring jam |
| A4 Knonaueramt (Zurich south) | 18,000 km | Zurich south ring + Gotthard backup feed |
| A3 Basel-Zurich (Sissach) | 16,000 km | Daily commute, recurring lane reductions |
| A2 Seelisberg (Lucerne-Altdorf) | 14,000 km | Gotthard approach, Saturday backup |
The Gotthard bottleneck
The A2 Gotthard Road Tunnel between Goeschenen (Uri) and Airolo (Ticino) is the single most congested point in the Swiss network. It is also the strategic north-south corridor through the Alps for the Italian leg of routes from Germany, France, Benelux and the UK. The tunnel itself is 17 km long, one bore, two-way traffic, with a strict 80 km/h limit and a 150-metre separation rule between vehicles.
Why the queues happen
Demand exceeds capacity at peak summer Saturdays. The tunnel handles about 17,000 vehicles per day on average but up to 30,000 on the worst summer Saturdays. Capacity is fixed at around 1,000 vehicles per hour per direction. The combination of holiday demand and limited capacity produces queues of 5-10 km at the north portal in the morning and the south portal in the afternoon.
Avoiding the worst slots
- Friday evening or Sunday after 19:00: usually flowing freely
- Saturday before 06:00 or after 20:00: usually flowing freely
- Mid-week any time: rare congestion outside accidents
- Monday-Thursday on holiday weeks: still busy but manageable
Alternatives when Gotthard is congested
- A13 San Bernardino Tunnel: longer route via Chur and Mesocco, often quieter on Saturdays, free
- Car-shuttle through Furka tunnel: Realp-Oberwald, ~CHF 38, 15-minute crossing, sometimes 30-90 min wait at peak
- Car-shuttle through Lötschberg tunnel: Kandersteg-Goppenstein, ~CHF 28, useful for Geneva-Italy via Brig
- Gotthard Pass road: only May-October, scenic but slow, 13 km of switchbacks each side
- Detour via Mont Blanc or Brenner: significant kilometres but bypasses Switzerland entirely
A2 status via ASTRA: astra.admin.ch.
A1 Zurich-Geneva corridor
The A1 between Zurich and Geneva is Switzerland’s commercial spine and its longest single motorway (about 280 km). Congestion is highly localised:
- Limmattaler Kreuz (junction A1/A3 near Zurich): daily peak congestion
- Bareggtunnel (Baden area): morning eastbound, evening westbound
- Geneva Bardonnex: customs check delay
- Lausanne section: rush hour into the city
- Yverdon area: usually flowing
Peak times: weekday 07:00-09:00 and 17:00-19:00 around Zurich, 17:00-20:00 around Geneva. Summer Friday afternoon brings additional through-traffic.
A13 San Bernardino corridor
The A13 between Bellinzona-Chur via the San Bernardino tunnel is the main alternative to the Gotthard for north-south traffic. It is also longer (about 80 km extra Basel-Chiasso) and less direct. On most weekends it carries less traffic than the A2.
Peak congestion: summer Saturdays at the San Bernardino tunnel itself (similar pattern to Gotthard but on a smaller scale), and at the Chur ring road junction with the A3 east.
The pass road across the San Bernardino (not the tunnel) is closed from late October to mid-May. The tunnel operates year-round.
Alpine pass status
Most free alpine passes close in winter. Approximate closure dates:
| Pass | Typical closure window | Tunnel alternative |
|---|---|---|
| Furka (2,429 m) | November to May | Furka car-shuttle (Realp-Oberwald) |
| Susten (2,224 m) | November to May | Detour via Brünig (open year-round) |
| Grimsel (2,165 m) | November to May | Detour via Lötschberg car-shuttle |
| Klausen (1,948 m) | November to April | Detour via A2 Gotthard |
| Oberalp (2,044 m) | November to April | Rail tunnel only in winter |
| Lukmanier (1,915 m) | November to April | Detour via A2 Gotthard |
| Flüela (2,383 m) | November to May | Vereina car-shuttle (Klosters-Sagliains) |
| Great St Bernard (2,476 m) | October to June | Great St Bernard Tunnel (toll) |
| San Bernardino (2,065 m) | November to May | A13 San Bernardino Tunnel (free) |
| Splügen (2,114 m) | November to May | A13 San Bernardino Tunnel |
ASTRA publishes the precise opening and closing date for each pass; checking the day before travel is recommended in shoulder seasons.
Tunnel closures and emergency procedures
Swiss tunnels operate under strict safety rules. Most have:
- Automated incident detection: cameras and air-quality sensors close lanes within seconds of a problem
- Mandatory 150-metre separation: enforced by camera at Gotthard, Seelisberg and Belchen
- Speed-coordinated systems: variable signs adjust speed limit to current density
- Emergency lay-bys every 250-600 m for breakdowns
- Direct phone connection to ASTRA control centre
When a major tunnel closes for an accident, traffic is rerouted to the nearest alternative. Gotthard accidents typically reroute via San Bernardino (A13), adding 80 km. The Seelisberg tunnel on the A2 has been the site of major incidents in past years and has stricter speed enforcement than other Swiss tunnels.
Saturday-by-Saturday summer planning
For visitors transiting Switzerland in July or August, plan around the following Saturdays:
- First Saturday of July: school holidays start in many German Länder, peak demand
- Mid-July to mid-August: peak every Saturday
- Around 15 August (Italian Ferragosto): worst single weekend of the year
- Last Saturday of August: return traffic peak
Sundays are generally easier, with the bonus that Italian truck driving bans (Sunday) reduce A2 freight traffic. Wednesday-Thursday transits are almost always free-flowing.
Live tools to use during your trip
- ASTRA Pannenhilfe app: free, iOS/Android, official roadside assistance + traffic
- TCS app: free, broader feature set, English-friendly
- Waze: best for Gotthard queue estimation
- Google Maps with live data: accurate on motorways
- SRF traffic news: radio on FM, DAB+ and the SRF app
- Twitter/X @ViasuisseTraffic: short-form alerts in German
- Webcams: ASTRA hosts cameras at all major tunnel portals; useful before joining the motorway
Snow chains and winter equipment
Winter tyres are recommended (not legally mandated) from 1 November to 30 April. However, if you have an accident in winter conditions with summer tyres, you carry liability for damages.
Snow chains are mandatory only on roads marked with the round blue snow-chain sign. In practice this means:
- Most alpine pass roads when open in shoulder season
- The A13 around the San Bernardino tunnel approaches in heavy snow
- Local cantonal roads in the Grisons, Valais, Bern Oberland in winter storms
Chains for the rear axle on a front-wheel-drive car are insufficient; chains must go on the driven axle.
Related topics: Switzerland
- Traffic info · Routes + peaks
- Toll roads · Per-country prices
- Fuel prices · Per-station prices
- Driving rules · Speed, alcohol
- EV charging · Charger map